Low Pressure Air Testing of Sewers

Written by Design Data | 10/4/21 9:06 PM

Design Data 23:  Low Pressure Air Testing of Sewers

Acceptance tests are included in sewer contract documents to assure the necessary combination of good workmanship and materials is obtained during construction of the project. This Design Data describes the application and limitations of low pressure air testing of installed concrete pipe sewers and provides information and guidelines for proper application of the test and interpretation of results.